Smart Building (UC Berkeley)

Facebook
Twitter
LinkedIn
Smart Building

The goal of Smart Building is to validate an adaptive, real-time, automated energy management solution, Energy Management System (EMS), through pilots at commercial building sites, starting with restaurants and office buildings. Restaurants have the highest energy intensity of all commercial buildings, and office buildings are the largest energy consumers of all commercial buildings. Estimated annual energy cost savings are over $3,200 for the median restaurant, and $22,000 for a medium-large office, representing ten and twenty percent savings, respectively, on the utility bills for these buildings. Once validation is completed, and feasibility is established, the team plans to commercialize the product, and will seek to scale rapidly through strategic partnerships and licensing.

More Winners

Bare Abundance (UC Berkeley)

Studies demonstrate a strong correlation between overall scarcity of nutritious food in low-income communities and high obesity rates and other health-related problems. BareAbundance strives to

Read More »

One Village Philippines

One Village Philippines is a multidisciplinary team of fifteen engineering students within the UC San Diego Global TIES program. This team is working together with

Read More »

© 2021 Blum Center for Developing Economies

Design by Joseph Kim